Securing Higher Grades Costing Your Pocket? Book Your Assignment at The Lowest Price Now!







The Department of Defense

In the Department of Defense (DoD), the __________ process documents the warfighter’s performance, operational and support requirements.

  • Joint Capabilities Integration & Development System (JCIDS)

Fault Tree Analysis provides insight into __________. All answers are correct

FMECA should be scheduled and completed concurrently as an integral part of the Design process.

Reliable, maintainable, and available systems reduce the _______ which translates into reduced costs to acquire and support it over its life cycle. Demand for logistics

GEIA-STD-0007 re-establishes the industry/DoD exchange of LSAR data in a common format. True

The _____ maintenance is considered either preventive or predictive in nature, and the maintenance performed can range from an inspection, test, or servicing to an overhaul or complete replacement. Proactive

LORA increases equipment quantity, equipment availability, or program capability False

Which of the following statements describes the life cycle Logistician’s involvement in Supportability Analysis? The LCL will participate in all phases of Supportability Analysis

Which three of the following are determined through step 1: identify the market?

  • Product or Service?
  • What are the requirements?
  • Who are the users?

Which element of the Supportability Analysis Framework is described by the statement “Ensures functional requirements are allocated and traceable throughout the system and its subsystems, and that the design reflects those requirements in terms of form, fit and function”? Design Reviews and Evaluation

The _____ are (is) a measure of system Supportability as it relates to the inherent system design as well as the efficiency and effectiveness of external logistics support Sustainment KPP/KSAs

There is only one format for a maintenance plan and all acquisition programs must follow it. False

A _____ identifies detailed logistics and support resource requirements to sustain system readiness.

Maintenance task analysis

Which of the following statements describes Reliability Centered Maintenance (RCM)? All answers are correct

Which of the following statements best describes reliability? The probability that a system will perform in a satisfactory manner for a given period of time when used under specified operating conditions.

Maintenance Planning is the process conducted to translate the maintenance approach stated in the system operational requirement into maintenance task requirements that ensure the ongoing availability of the system. True

What are the two types of market research?

  • Strategic market research
  • Tactical market research

Logistics Product Data are generated as a result of drawing interpretation or through the accomplishment of Supportability Analyses such as All answers are correct

The _____ serves as a key component of the “Plus” portion of CBM+ by providing the ability to predict future health status of a system or component, as well as providing the ability to anticipate faults, problems, potential failures, and required maintenance actions. Prognostics and Health Management (PHM)

Supportability Analysis is a wide range of analyses that should be conducted within contracting process.

The _____ is the evaluation of the performance, operational effectiveness, operational suitability and costs of alternative systems being considered to meet a mission capability. Analysis of Alternatives

The _____ is a standard that specifies the information exchange requirements for most materiel management functions commonly performed in supporting international projects. S2000M

Which three of the following are steps in the seven steps of market investigation?

  • Summarize Market Surveillance
  • Formulate Requirements
  • Identify Sources of Information

Rigorous component and sub-system DT&E enables performance capability and reliability improvements to be designed into the system. True

The process of translating system maintainability requirements into lower-level design criteria is accomplished through reliability analysis.

Which Acquisition phase places a key emphasis on ensuring operational supportability with particular attention to minimizing logistics footprint? Engineering and Manufacturing Development (EMO)

 The _____________ is a multi-disciplined product and process assessment to ensure that the system can proceed into Initial Operational Test and Evaluation with a high probability of success.

Operational Test Readiness Review (OTRR)

Want latest solution of this assignment

Submit Your Assignment Here

AssignmentHippo Features

On Time Delivery

Our motto is deliver assignment on Time. Our Expert writers deliver quality assignments to the students.

Plagiarism Free Work

Get reliable and unique assignments by using our 100% plagiarism-free.

24 X 7 Live Help

Get connected 24*7 with our Live Chat support executives to receive instant solutions for your assignment.

Services For All Subjects

Get Help with all the subjects like: Programming, Accounting, Finance, Engineering, Law and Marketing.

Best Price Guarantee

Get premium service at a pocket-friendly rate at AssignmentHippo

FREE RESOURCES

  • Assignment Writing Guide
  • Essay Writing Guide
  • Dissertation Writing Guide
  • Research Paper Writing Guide

FREE SAMPLE FILE

  • Accounts
  • Computer Science
  • Economics
  • Engineering

Client Review

I was struggling so hard to complete my marketing assignment on brand development when I decided to finally reach to the experts of this portal. They certainly deliver perfect consistency and the desired format. The content prepared by the experts of this platform was simply amazing. I definitely owe my grades to them.

Tap to Chat
Get instant assignment help